Sunday Mar 07 2010
Sutter Street Construction
By: Telegraph Photography by Philip Wood
Philip Wood/The Telegraph
Brian Reigler, left, removes dirt and rocks from under the ground on Reading Street to make way for the instal-lation of a sewage line as part of the revitalization of Sutter Street March 24, 2010.
Brian Reigler, left, removes dirt and rocks from under the ground on Reading Street to make way for the instal-lation of a sewage line as part of the revitalization of Sutter Street March 24, 2010.
Philip Wood/The Telegraph
Marvin Doais cuts a branch off one of the trees on Sutter Street that were removed March 4 as part of the historic street's revitalization.
Marvin Doais cuts a branch off one of the trees on Sutter Street that were removed March 4 as part of the historic street's revitalization.
Philip Wood/The Telegraph
Construction workers dig under Sutter Street to check for lines and pipes.
Construction workers dig under Sutter Street to check for lines and pipes.
Philip Wood/The Telegraph
A construction worker makes the pavement were a line or cable is supposed to be under ground that will be dug into to see if it's where it's supposed to be.
A construction worker makes the pavement were a line or cable is supposed to be under ground that will be dug into to see if it's where it's supposed to be.
Philip Wood/The Telegraph
Workers remove the final granite pillar on Sutter Street in the first phase of clearing the median for removal.
Workers remove the final granite pillar on Sutter Street in the first phase of clearing the median for removal.
Philip Wood/The Telegraph
Sutter Street on March 4 after the trees were cut down before the stumps were pulled out.
Sutter Street on March 4 after the trees were cut down before the stumps were pulled out.
Philip Wood/The Telegraph
Tree cutter Marvin Doais takes down a tree on Sutter Street in preparation for the removal of the street's median.
Tree cutter Marvin Doais takes down a tree on Sutter Street in preparation for the removal of the street's median.
Philip Wood/The Telegraph
A crane clears the downed tree debris out of the median on Sutter Street after they were cut down on March 4 in the revitalization project.
A crane clears the downed tree debris out of the median on Sutter Street after they were cut down on March 4 in the revitalization project.
Philip Wood/The Telegraph
Sutter Street after the trees were cleared from the median.
Sutter Street after the trees were cleared from the median.
Philip Wood/The Telegraph
Upon removing portions of the median, the original pavement with the divider lines under the it were revealed March 5 on Sutter Street.
Upon removing portions of the median, the original pavement with the divider lines under the it were revealed March 5 on Sutter Street.